En resumen
Forest Service, entidad pública de Estados Unidos, publicó esta licitación. Las ofertas se presentan en SAM.gov hasta el 30 de septiembre de 2026 (faltan 3 días). El plazo total para ofertar es de 13 días. El portal no publica un valor estimado.
Ficha
| Entidad compradora | Forest Service |
|---|---|
| Valor estimado | valor no publicado en el portal |
| Cierre de ofertas | 30 de septiembre de 2026, 21:00 (hora de UTC) |
| Publicada | 17 de septiembre de 2026 |
| País | Estados Unidos · SAM.gov |
| Número de proceso | f1be61ee46c841319b7de58af19ea744 |
| Códigos de categoría | NAICS 238990, PSC Z2PZ |
Fechas
Publicada17 sep 2026Cierre de ofertas30 sep 2026 · 21:00 (hora de UTC)
Descripción oficial
On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Cómo participar
- Registra tu empresa en SAM.gov (es gratis) para obtener el identificador único de entidad (UEI). La mayoría de las solicitudes exigen el registro activo al presentar la oferta, y el trámite puede tardar varias semanas.
- Abre el aviso en SAM.gov y lee la solicitud, sus anexos y cada enmienda.
- Presenta tu oferta exactamente como indica el aviso, antes de la fecha de respuesta.