Federal Highway Administration, entidad pública de Estados Unidos, publicó esta licitación. Las ofertas se presentan en SAM.gov hasta el 16 de octubre de 2026 (faltan 13 días). El plazo total para ofertar es de 15 días. El portal no publica un valor estimado.
Ficha
| Entidad compradora | Federal Highway Administration |
|---|---|
| Valor estimado | valor no publicado en el portal |
| Cierre de ofertas | 16 de octubre de 2026, 20:00 (hora de UTC) |
| Publicada | 1 de octubre de 2026 |
| País | Estados Unidos · SAM.gov |
| Número de proceso | e6ce7a2f0949412d95eb0cf685855c08 |
| Códigos de categoría | NAICS 237310, PSC Y1LB |
Fuentes públicas; puede tener errores; no es asesoría de inversión.
Fechas
Publicada1 oct 2026Cierre de ofertas16 oct 2026 · 20:00 (hora de UTC)
Descripción oficial
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: CO OMAD 300(71) PROJECT NAME: Minuteman Missile Access PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 73 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes up to 85.75 miles of variable scope roadway reconditioning and re-graveling, and up to 73 culverts of variable scope in length. The project PS&E will provide a prioritized schedule of roadways to be improved that includes roadway reconditioning and re-graveling of existing aggregate surface roads within the existing roadway bench; as well as the replacement of up to 73 culverts. PRINCIPAL WORK ITEMS: 67001-0000 Project Lump Sum (Section 152 – Survey and Staking Drainage Structure) 67001-0000 Project Lump Sum (Section 153 – Contractor Quality Control) 67001-0000 Project Lump Sum (Section 602 – Pipe Culvert) 67001-0000 Project Lump Sum (Section 301 – Aggregate Surface Course) ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-December - 2026 Construction – April 2027 through September 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000
Cómo participar
- Registra tu empresa en SAM.gov (es gratis) para obtener el identificador único de entidad (UEI). La mayoría de las solicitudes exigen el registro activo al presentar la oferta, y el trámite puede tardar varias semanas.
- Abre el aviso en SAM.gov y lee la solicitud, sus anexos y cada enmienda.
- Presenta tu oferta exactamente como indica el aviso, antes de la fecha de respuesta.