En resumen
US Fish and Wildlife Service, entidad pública de Estados Unidos, publicó esta licitación. Las ofertas se presentan en SAM.gov hasta el 5 de octubre de 2026 (faltan 5 días). El plazo total para ofertar es de 7 días. El portal no publica un valor estimado.
Ficha
| Entidad compradora | US Fish and Wildlife Service |
|---|---|
| Valor estimado | valor no publicado en el portal |
| Cierre de ofertas | 5 de octubre de 2026, 17:00 (hora de UTC) |
| Publicada | 28 de septiembre de 2026 |
| País | Estados Unidos · SAM.gov |
| Número de proceso | b3bc9550fab242e2a237038acfe37e2d |
| Códigos de categoría | NAICS 321991, PSC 5410 |
Fuentes públicas; puede tener errores; no es asesoría de inversión.
Fechas
Publicada28 sep 2026Cierre de ofertas5 oct 2026 · 17:00 (hora de UTC)
Descripción oficial
IA - Temp Modular Office Space approx. 36X56 The setup of the temporary office space is expected to be completed and turned over for government occupancy on 11/30/26 and the first day of billing for the base year rental will be 11/30/26. Vendor will submit a packet with drawings and description for the office space that meets the SOW to be offered and a written plan for the installation and set up. Submit a filled out a price sheet, 1st page of the packet. This is a rental contract for temporary office space, not a construction contract. Bonding is not required. See attached packet. For questions and to submit your packet, Q: The maintenance yard that this modular building is to be located shows a gravel surface. Unless ADA requirements changed this month, that would not be an acceptable surface for a ramp. Asphalt or concrete, or a solid, smooth surface is needed. Is a ramp needed as I am not seeing anything that indicates a handicap parking area is needed for the ramp to terminate? A: ADA and ABA require level and slip-resistant landings that are free of obstructions. Compacted gravel meets this requirement. Provide accessible ramps per the scope of work. Q: Is low voltage wiring required for phone/data? A: Yes Q: Will office furniture be needed? A: No. Q: When is the expected move in date acceptance of the office space 11/30/26. Contract will start on 11/30/26, but can be adjusted as needed. Temporary office space is expected to be fully set (utilities) up on date the contract starts. NOTE: Vendor is no longer required to submit mockups, however Floor plans/drawings and a written description is required. [contact details on the official notice]
Cómo participar
- Registra tu empresa en SAM.gov (es gratis) para obtener el identificador único de entidad (UEI). La mayoría de las solicitudes exigen el registro activo al presentar la oferta, y el trámite puede tardar varias semanas.
- Abre el aviso en SAM.gov y lee la solicitud, sus anexos y cada enmienda.
- Presenta tu oferta exactamente como indica el aviso, antes de la fecha de respuesta.