Em resumo
US Fish and Wildlife Service, órgão público (Estados Unidos), publicou esta licitação. As propostas são apresentadas no portal SAM.gov até 5 de outubro de 2026 (faltam 5 dias). O prazo total para propostas é de 7 dias. O portal não publica um valor estimado.
Ficha
| Órgão comprador | US Fish and Wildlife Service |
|---|---|
| Valor estimado | valor não publicado no portal |
| Encerramento das propostas | 5 de outubro de 2026, 17:00 (horário de UTC) |
| Publicada | 28 de setembro de 2026 |
| País | Estados Unidos · SAM.gov |
| Número do processo | b3bc9550fab242e2a237038acfe37e2d |
| Códigos de categoria | NAICS 321991, PSC 5410 |
Fontes públicas; pode conter erros; não é aconselhamento de investimento.
Datas
Publicada28 set 2026Encerramento das propostas5 out 2026 · 17:00 (horário de UTC)
Descrição oficial
IA - Temp Modular Office Space approx. 36X56 The setup of the temporary office space is expected to be completed and turned over for government occupancy on 11/30/26 and the first day of billing for the base year rental will be 11/30/26. Vendor will submit a packet with drawings and description for the office space that meets the SOW to be offered and a written plan for the installation and set up. Submit a filled out a price sheet, 1st page of the packet. This is a rental contract for temporary office space, not a construction contract. Bonding is not required. See attached packet. For questions and to submit your packet, Q: The maintenance yard that this modular building is to be located shows a gravel surface. Unless ADA requirements changed this month, that would not be an acceptable surface for a ramp. Asphalt or concrete, or a solid, smooth surface is needed. Is a ramp needed as I am not seeing anything that indicates a handicap parking area is needed for the ramp to terminate? A: ADA and ABA require level and slip-resistant landings that are free of obstructions. Compacted gravel meets this requirement. Provide accessible ramps per the scope of work. Q: Is low voltage wiring required for phone/data? A: Yes Q: Will office furniture be needed? A: No. Q: When is the expected move in date acceptance of the office space 11/30/26. Contract will start on 11/30/26, but can be adjusted as needed. Temporary office space is expected to be fully set (utilities) up on date the contract starts. NOTE: Vendor is no longer required to submit mockups, however Floor plans/drawings and a written description is required. [contact details on the official notice]
Como participar
- Cadastre sua empresa no SAM.gov (é gratuito) para obter o identificador único de entidade (UEI). A maioria das solicitações exige o cadastro ativo ao apresentar a proposta, e o processo pode levar várias semanas.
- Abra o aviso no SAM.gov e leia a solicitação, os anexos e cada alteração.
- Apresente sua proposta exatamente como o aviso indica, antes da data de resposta.