Em resumo
Federal Highway Administration, órgão público (Estados Unidos), publicou esta licitação. Pelas palavras do título, nós a classificamos como construção e infraestrutura. O portal não publica a data de encerramento: confira o cronograma no site SAM.gov. O portal não publica um valor estimado.
Ficha
| Órgão comprador | Federal Highway Administration |
|---|---|
| Valor estimado | valor não publicado no portal |
| Encerramento das propostas | sem data de encerramento publicada |
| Publicada | 23 de setembro de 2026 |
| País | Estados Unidos · SAM.gov |
| Número do processo | ee62a64de8774ef9b10b1f057b0fe8cc |
| Códigos de categoria | NAICS 237310, PSC Y1LB |
Descrição oficial
PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details. LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
Como participar
- Cadastre sua empresa no SAM.gov (é gratuito) para obter o identificador único de entidade (UEI). A maioria das solicitações exige o cadastro ativo ao apresentar a proposta, e o processo pode levar várias semanas.
- Abra o aviso no SAM.gov e leia a solicitação, os anexos e cada alteração.
- Apresente sua proposta exatamente como o aviso indica, antes da data de resposta.