Em resumo
Veterans Affairs, Department of, órgão público (Estados Unidos), publicou esta licitação. As propostas são apresentadas no portal SAM.gov até 23 de outubro de 2026 (faltam 14 dias). O prazo total para propostas é de 16 dias. O portal não publica um valor estimado.
Ficha
| Órgão comprador | Veterans Affairs, Department of |
|---|---|
| Valor estimado | valor não publicado no portal |
| Encerramento das propostas | 23 de outubro de 2026, 14:00 (horário de UTC) |
| Publicada | 7 de outubro de 2026 |
| País | Estados Unidos · SAM.gov |
| Número do processo | 7d289bea83eb49708aa2232e2ce8262b |
| Códigos de categoria | NAICS 238210, PSC Z1DA |
Fontes públicas; pode conter erros; não é aconselhamento de investimento.
Datas
Publicada7 out 2026Encerramento das propostas23 out 2026 · 14:00 (horário de UTC)
Descrição oficial
Description: Â The Richard L. Roudebush VA Medical Center (RLR VAMC) has developed this project for the purpose of replacing and expanding the electrical distribution infrastructure serving the A-Wing of Building 1 (the main hospital tower). Generally, the work shall be required to include, but not be limited to the replacement and expansion of the secondary electrical distribution system serving A-Wing of Building 1 and the expansion and modification of the existing primary Medical Center campus electrical distribution system as required to support those improvements including work associated within Building 01 (A-Wing), Building 23, and adjacent exterior/campus utility areas as indicated in the contract drawings and specifications. Â Definitization of Equitable Adjustments: Â When/if change orders are issued under the resulting contract, they will be issued under the following authority(s): FAR 52.243-4, Changes (JUL 2025) (Deviation), VAAR 852.243-70, Construction Contract Changes Supplement (SEP 2019). Â The agency will follow the procedures located at FAR 43, VAAR 843 and VAAM M843. The Contracting Officer will make the final decisions for items not addressed by regulation or policy. Â The agency's past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts will be posted as soon as it is available. Â Additional Acquisition Information: Â All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Â At the time of submission of offers/quotes, and at the time of award of any contract, the offeror must represent to the contracting officer that it is a SDVOSB/VOSB eligible under this subpart, small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition and certified SDVOSB/VOSB listed in the SBA certification database at https://search.certifications.sba.gov. Â A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations. To receive a benefit under the Veterans First Contacting Program, an otherwise eligible SDVOSB/VOSB certified pursuant to 13 CFR 128, must also meet SBA requirements at 13 CFR parts 121, 125, and 128 including the nonmanufacturer rule requirements at 13 CFR 121.406(b) and limitations on subcontracting at 13 CFR 125.6. The nonmanufacturer rule (see 13 CFR 121.406) and the limitations on subcontracting requirements apply to all SDVOSB and VOSB set-aside and sole source contracts above the micro-purchase threshold. In addition, an offeror shall submit a certification of compliance to be considered eligible for any award under this part (see 819.7004). Pursuant to 38 USC 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB/VOSB status is subject to d
Como participar
- Cadastre sua empresa no SAM.gov (é gratuito) para obter o identificador único de entidade (UEI). A maioria das solicitações exige o cadastro ativo ao apresentar a proposta, e o processo pode levar várias semanas.
- Abra o aviso no SAM.gov e leia a solicitação, os anexos e cada alteração.
- Apresente sua proposta exatamente como o aviso indica, antes da data de resposta.