Energy, Department of, órgão público (Estados Unidos), publicou esta licitação. Pelas palavras do título, nós a classificamos como construção e infraestrutura. As propostas são apresentadas no portal SAM.gov até 17 de novembro de 2026 (faltam 51 dias). O prazo total para propostas é de 61 dias. O portal não publica um valor estimado.
Ficha
| Órgão comprador | Energy, Department of |
|---|---|
| Valor estimado | valor não publicado no portal |
| Encerramento das propostas | 17 de novembro de 2026, 22:00 (horário de UTC) |
| Publicada | 17 de setembro de 2026 |
| País | Estados Unidos · SAM.gov |
| Número do processo | b3e96254b8dc47f48e58f2821e5100ad |
| Códigos de categoria | NAICS 236210, PSC Z2EZ |
Datas
Publicada17 set 2026Encerramento das propostas17 nov 2026 · 22:00 (horário de UTC)
Descrição oficial
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Como participar
- Cadastre sua empresa no SAM.gov (é gratuito) para obter o identificador único de entidade (UEI). A maioria das solicitações exige o cadastro ativo ao apresentar a proposta, e o processo pode levar várias semanas.
- Abra o aviso no SAM.gov e leia a solicitação, os anexos e cada alteração.
- Apresente sua proposta exatamente como o aviso indica, antes da data de resposta.