In short
Energy, Department of, a public buyer in United States, published this tender. From keywords in its title, we tagged it as construction & infrastructure. Bids go through SAM.gov until November 17, 2026 (51 days left). The whole bidding period is 61 days. The portal doesn't publish an estimated value.
Details
| Buyer | Energy, Department of |
|---|---|
| Estimated value | value not published on the portal |
| Bid deadline | November 17, 2026, 22:00 (UTC time) |
| Published | September 17, 2026 |
| Country | United States · SAM.gov |
| Process number | b3e96254b8dc47f48e58f2821e5100ad |
| Category codes | NAICS 236210, PSC Z2EZ |
Dates
PublishedSep 17, 2026Bid deadlineNov 17, 2026 · 22:00 (UTC time)
Official description
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
How to bid
- Register your business in SAM.gov (free) to get a Unique Entity ID (UEI). Most solicitations require an active registration when you submit your offer, and registering can take several weeks.
- Open the notice on SAM.gov and read the solicitation, its attachments and every amendment.
- Submit your offer exactly as the notice says, before the response date.