Em resumo
Federal Highway Administration, órgão público (Estados Unidos), publicou esta licitação. Pelas palavras do título, nós a classificamos como construção e infraestrutura. As propostas são apresentadas no portal SAM.gov até 30 de setembro de 2026 (faltam 3 dias). O prazo total para propostas é de 15 dias. O portal não publica um valor estimado.
Ficha
| Órgão comprador | Federal Highway Administration |
|---|---|
| Valor estimado | valor não publicado no portal |
| Encerramento das propostas | 30 de setembro de 2026, 20:00 (horário de UTC) |
| Publicada | 15 de setembro de 2026 |
| País | Estados Unidos · SAM.gov |
| Número do processo | 04633d3deaa74bd9856924934d466a6d |
| Códigos de categoria | NAICS 237310, PSC Y1LB |
Datas
Publicada15 set 2026Encerramento das propostas30 set 2026 · 20:00 (horário de UTC)
Descrição oficial
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
Como participar
- Cadastre sua empresa no SAM.gov (é gratuito) para obter o identificador único de entidade (UEI). A maioria das solicitações exige o cadastro ativo ao apresentar a proposta, e o processo pode levar várias semanas.
- Abra o aviso no SAM.gov e leia a solicitação, os anexos e cada alteração.
- Apresente sua proposta exatamente como o aviso indica, antes da data de resposta.