Carbonode ESPT

United States · SAM.gov

AZ BL COLO 7528(1) Burro Creek Road

Federal Highway Administration

Official title in English · Leer en español

In short

Federal Highway Administration, a public buyer in United States, published this tender. From keywords in its title, we tagged it as construction & infrastructure. Bids go through SAM.gov until September 30, 2026 (3 days left). The whole bidding period is 15 days. The portal doesn't publish an estimated value.

Details

BuyerFederal Highway Administration
Estimated valuevalue not published on the portal
Bid deadlineSeptember 30, 2026, 20:00 (UTC time)
PublishedSeptember 15, 2026
CountryUnited States · SAM.gov
Process number04633d3deaa74bd9856924934d466a6d
Category codesNAICS 237310, PSC Y1LB

Dates

PublishedSep 15, 2026Bid deadlineSep 30, 2026 · 20:00 (UTC time)

Official description

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

How to bid

  1. Register your business in SAM.gov (free) to get a Unique Entity ID (UEI). Most solicitations require an active registration when you submit your offer, and registering can take several weeks.
  2. Open the notice on SAM.gov and read the solicitation, its attachments and every amendment.
  3. Submit your offer exactly as the notice says, before the response date.

Related opportunities

United States →
Closes in 3 daysSep 30 Official notice (opens in a new tab)