Carbonode ESPT

United States · SAM.gov

CO NP ROMO 407(1) Holzwarth Culvert

Federal Highway Administration

Official title in English · Leer en español

In short

Federal Highway Administration, a public buyer in United States, published this tender. From keywords in its title, we tagged it as water & sanitation. Bids go through SAM.gov until October 20, 2026 (23 days left). The whole bidding period is 34 days. The portal doesn't publish an estimated value.

Details

BuyerFederal Highway Administration
Estimated valuevalue not published on the portal
Bid deadlineOctober 20, 2026, 20:00 (UTC time)
PublishedSeptember 16, 2026
CountryUnited States · SAM.gov
Process numberca5a8d1d2c63414488418b32e5abf45d
Category codesNAICS 237310, PSC Y1LB

Dates

PublishedSep 16, 2026Bid deadlineOct 20, 2026 · 20:00 (UTC time)

Official description

SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68” dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – December 2026 NTP – December 2026 Contract Completion – November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.

How to bid

  1. Register your business in SAM.gov (free) to get a Unique Entity ID (UEI). Most solicitations require an active registration when you submit your offer, and registering can take several weeks.
  2. Open the notice on SAM.gov and read the solicitation, its attachments and every amendment.
  3. Submit your offer exactly as the notice says, before the response date.

Related opportunities

United States →
Closes in 23 daysOct 20 Official notice (opens in a new tab)