In short
State, Department of, a public buyer in United States, published this tender. We tagged it as construction & infrastructure. Bids go through SAM.gov until October 26, 2026 (16 days left). The whole bidding period is 17 days. The portal doesn't publish an estimated value.
Details
| Buyer | State, Department of |
|---|---|
| Estimated value | value not published on the portal |
| Bid deadline | October 26, 2026, 19:00 (UTC time) |
| Published | October 9, 2026 |
| Country | United States · SAM.gov |
| Process number | b556277dcd5444b78f1c77c33060368d |
| Category codes | NAICS 238910, PSC J038 |
Public sources; may contain errors; not investment advice.
Dates
PublishedOct 9, 2026Bid deadlineOct 26, 2026 · 19:00 (UTC time)
Official description
Description The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound. Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job Infrastructure Support System - Handhole / Underground Conduit System Trenching Nine locations have been identified requiring trench work. Thirteen locations have been identified requiring trench work. Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment. If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding. Trenching from Handholes The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings. Conduit Existing conduit shall remain in place unless the drawings specifically direct removal or modification. Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater. All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends. Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers. The Contractor shall install pull lines in all new conduit runs. Soil and Backfill Materials Soil Materials The Contractor shall provide all labor and materials for soil and backfill, where required. Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter. Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve. Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve. Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand. Placement and Compaction Place backfill and fill in layers not exceeding: 8 inches (203 mm) loose thickness for heavy compaction equipment; 4 inches (102 mm) loose thickness when compacted by hand-operated tampers. Place backfill and fill evenly to the required elevations, uniformly along their full length. Compact soil materials to not less than the fo
How to bid
- Register your business in SAM.gov (free) to get a Unique Entity ID (UEI). Most solicitations require an active registration when you submit your offer, and registering can take several weeks.
- Open the notice on SAM.gov and read the solicitation, its attachments and every amendment.
- Submit your offer exactly as the notice says, before the response date.